Skip to main content
Pune · Maharashtra · India
Shop Capacity Planning · Fabrication & Job-Work Edition

FULCRUM SCPResource clarity.
Delivery promises you can keep.

Built specifically for fabrication and project manufacturing environments. FULCRUM SCP gives shop managers real-time workload visibility, forward/backward scheduling, and the ability to spot bottlenecks before they become missed deadlines.

FULCRUM SCP shop capacity planning preview
FULCRUM-SCP_Main.png

Job-work isn’t mass production. Your planning system shouldn’t treat it that way.

In job-work, no two jobs are alike. The operation list changes from job to job. Delivery schedules shift as project milestones move. Priorities re-shuffle as customer escalations arrive. Mass-production planning tools force a stable, repeating world onto shops that don’t live in one — and the plan ends up in a spreadsheet within months. FULCRUM SCP is built for the way job-work actually runs.

Mass-Production Planning Tools

Built for repetition

  • Assume stable BOMs and fixed routings
  • Capacity planning based on line rate or takt time
  • Operations defined once in master data, then frozen
  • Treat delivery dates as static commitments
  • Re-planning is heavy — so it rarely happens
Job-Work Reality

Built around constant change

  • Every job is one-of-a-kind — no two routings identical
  • Operation list defined per job, often revised mid-execution
  • Delivery dates move with upstream project progress
  • Priorities re-shuffle daily as escalations arrive
  • Engineering changes ripple straight into the shop plan
FULCRUM SCP Advantage

Built for job-work dynamics

  • Define and edit operations job-by-job — not in a frozen master
  • Re-sequence and re-plan in minutes when scope shifts
  • Delivery dates linked to project milestones, auto-flagged when at risk
  • Forward and backward scheduling from the live delivery date
  • Live R/O/G status surfaces priority changes as they happen

Six capabilities that change how your shop runs.

Every feature is grounded in real fabrication and job-work practice — not a generic planning textbook.

Project & Equipment-Based Planning

Plan shop capacity by project, equipment list, and process workflow — the way your shop actually thinks about work.

Fabrication Shop Scheduling

Forward and backward scheduling with task dependencies, completion tracking, and real-time status updates — from the planner’s desk to the floor.

Machining Shop Management

Job-card-based tracking for machining processes, with flexibility to re-sequence priorities as orders shift.

Dynamic Progress Monitoring

Live visual indicators (R/O/G) for delayed, near-due, and on-track tasks — so escalations happen before the customer calls.

Optimized Resource Utilization

Machine loading and workforce allocation that minimize idle time — without overbooking the bottleneck stations.

Proactive Delay Management

Bottleneck analysis surfaces risks early so corrective action happens while there’s still time to recover the schedule.

One glance. Every job’s status.

FULCRUM SCP colour-codes every task on the planning board, so planners and supervisors triage instantly — without opening a single report.

Red · Delayed

Past its due date

Task has missed its planned completion date. Triggers escalation views and bottleneck analysis so the planner knows where the shop is bleeding hours.

Orange · Near-Due

At risk

Approaching due date with work still pending. Flags critical tasks so resources can be reallocated before the slip turns into a delay.

Green · On Track

Healthy

Progressing on plan. Planners can focus their attention where it’s needed instead of chasing every order at every review.

Made for shops with real complexity.

FULCRUM SCP is configured for businesses where work isn’t repetitive and every order has its own routing.

Fabrication Shops
Job-Work Manufacturing
Process Equipment Manufacturing
Industrial Equipment Manufacturing
Project Engineering
EPC Companies
Machining Shops
Multi-Shop Operations

From chasing delays to predictable delivery.

What changes inside a fabrication or job-work shop once FULCRUM SCP is live.

✕ Before FULCRUM SCP

  • Machine loading is a guess in someone’s head
  • Delays surface only at the daily review meeting
  • Bottleneck stations identified after the slip happened
  • Re-planning is an Excel exercise every Monday
  • Delivery promises made on hope, not capacity
  • Floor and planning office work from different versions

✓ With FULCRUM SCP

  • Live machine loading visible to planner and supervisor
  • R/O/G status surfaces slips the moment they happen
  • Bottleneck analysis built into the planning view
  • One-click rescheduling when scope or priorities shift
  • Delivery commitments backed by real capacity data
  • Single shared plan — floor, planning, and management aligned

A structured rollout. Live in weeks, not quarters.

SCP implementations are scoped tightly — one shop at a time, with measurable outcomes at every step.

1
Shop
Discovery
2
Process
Mapping
3
Workflow
Configuration
4
Pilot
Scheduling
5
Planner
Training
6
Floor
Roll-out
7
Continuous
Tuning

See FULCRUM SCP on a board that looks like yours.

A 30-minute walk-through using a project routing close to your shop. No slideware — just the planning board, the status view, and your questions.